Sample property · Northeast Portland
A two-story backyard cottage fits this lot
The rear yard has room for an 800 SF detached ADU. The house and garage already use most of the allowed coverage, so the ADU goes two stories, or one story if the garage comes down. The main items to confirm are the trees in the rear yard and a small outbuilding that is not on record.

- Tax lot (county record)
- House
- Detached garage
- Likely build area
- Zone
- R7
- Lot size
- 7,680 SF
- Lot shape (approx.)
- 60 × 128 ft
- House on record
- 1,510 SF · 1954
- Garage
- Detached, 312 SF
- Basement
- 1,152 SF · 300 SF finished
- County market value
- ≈ $600,000
- Mapped hazards
- None mapped
- Slope / soil
- 4% slope · Soil group B
- Your timeline
- 6–12 months
Your project
Detached ADU (backyard cottage)
Allowed size up to ≈ 800 SF
One story fits up to about 624 SF of footprint here. Above that the ADU goes two stories, which adds about $12k for stairs and framing.
Includes design, permits, utility connections, construction and a contingency. Not included: financing, land and any system development charges that apply.
- County shows a 1,510 SF house and no existing ADU on record.
- About 800 SF over two stories: the 800 SF cap governs, with 624 SF of coverage room and 3,398 SF of floor-area room left.
- Height up to 20 ft outside the setbacks. No parking required.
- The likely build area of about 1,640 SF leaves a usable yard between the two homes.
Fees: ADU system development charges can be waived with a 10-year no-short-term-rental covenant.
Confirm early
Site-specific items to check for a detached ADU before design goes far.
- ConfirmPlacement and setbacksThe likely build area is about 1,640 SF in the rear yard, after the 5-ft side and rear setbacks and a 6-ft separation from the house. A one-story ADU can sit in a side or rear setback only if it is no larger than 24 × 24 ft and 15 ft tall, so an 800 SF unit stays outside them.
- NoteHow the size was setPortland caps a detached ADU at 800 SF or 75% of the house (1,132 SF here), so 800 SF governs. Coverage leaves 624 SF (2,652 SF allowed, less 2,028 SF of house and garage), so the ADU goes two stories. Floor area leaves 3,398 SF (0.6 × 7,680 SF, less the 1,210 SF of house above grade).
- ConfirmExisting garageThe detached garage counts toward total coverage and the accessory limit (1,199 SF here). Removing it frees about 270 SF of footprint and raises coverage room to about 896 SF, enough for a one-story 800 SF unit.
- ConfirmStructures not on recordThe aerial shows a small outbuilding in the rear yard that county records do not list. A site walk confirms whether it stays, moves or counts toward coverage.
- ConfirmTreesMapped canopy covers about 18% of the likely build area, and the frontage has 2 street trees, one 12" or larger. Trees 12" or larger trigger Portland tree preservation or mitigation rules, so a site walk checks them against the planned footprint.
- ConfirmProperty linesCounty lot lines are approximate. A boundary survey confirms setbacks before the design is fixed.
- ConfirmSewer connectionThe route and depth of the sewer line from the back of the lot to the street, and whether it drains by gravity or needs a pump.
- ConfirmWater and electrical serviceWhether the existing water meter and electrical panel can carry a second home, or need upsizing. Older houses often need a service upgrade.
- ConfirmAccessThe route from the street to the back of the lot for crews, materials and fire access. The driveway along the south side is the likely path.
- NoteAircraft landing overlayMapped over the whole lot. It sets maximum building heights near the airport and rarely limits houses.
- NoteStormwaterSoils on record are hydrologic group B (well drained), which usually allows on-site infiltration. A simple infiltration test confirms it.
- NoteFees and rental useADU system development charges can be waived with a 10-year covenant against short-term rentals. Decide on rental plans before permit submittal.
Next steps with Marsh
- 01Walk the site to check utilities, access and trees.
- 02Confirm placement, size and budget for the ADU.
- 03Get a full feasibility report with layouts, costs and a permit path.
Sample report for a real Northeast Portland lot, with the address left off and the market value rounded. Real reports are generated from public records (PortlandMaps or county GIS, the county assessor and local zoning) and Marsh planning assumptions. Results are not a zoning determination, permit approval, survey or appraisal. Cost ranges are preliminary planning targets, not bids, and exclude site-specific items such as utility upgrades and tree mitigation. Items marked Confirm are unresolved until verified.